A brief note/summary of the site visit conducted on April 1, 2022
Participants: Dr. Rajinder Singh & team, Mumbai March, New Link Road Residents Forum

Assembly: SGNP at 7.30 am
- Check dam inside SGNP was visited & issues related to contamination of Dahisar River inside SGNP were discussed.
- Tabela next to WEH was found to be contaminating Dahisar River by discharging animal dung.

- Slums along Dahisar highway were found to be discharging sewage & drain into the Dahisar River.
- In Dahisar West slums discharge sewage into the River & Dhobi talao along River seen.

- All along the Dahisar River MCGM approved buildings discharging waste into the River.
- Towards the end of Dahisar River where it meets the Dahisar creek, the River bed looks acidic.
- Visited Prithvi Palace CHSL terrace to get an aerial view of the vast stretch of Wetlands & Mangroves. Observations as under
- Rampant & unchecked construction of illegal slums encroaching into the mangroves.
- The sewage output of these slums is into the wetlands.
- Large number of public toilets were constructed on the creek with direct discharge into the sea.
- All garbage dumped in to the mangroves & subsequently burnt destroying moangroves.
- Large number of tourist buses illegally parked on reclaimed coastal water bodies.
- Constant threat to eco sensitive wetlands from Government / BMC planning new roads / bridges.
Solutions suggested:

- More checkered dams inside SGNP for water retention.
- Cutting of sewage discharge into the river inside SGNP.
- Closure of tabela near WEH.
- Cutting all sewage discharge from slums & buildings along the river.
- Removal of retention walls along the river.
- De- concretization of River bed.
- Put up nets at strategic locations to collect the garbage & waste flowing in the River.
- Cleaning of River & plantation of trees along the river.
- Clear encroachments on the mangroves & wetlands ( Collector & BMC)
- Demarcate the mangrove area coordinates as per the High Court orders & clear all encroachments beyond the demarcated area (Collector, BMC & Mangroves Cell).
- Clear all toilets with discharge into the sea.
- Clear garbage strewn across the slums.
- Ensure roads/bridges planned by authorities are realistic with minimum environmental damage.








Leave a comment